are | Ford Explorer Forums - Serious Explorations

  • Register Today It's free!

are

  1. The curved pliers are holding the stud.

    The curved pliers are holding the stud.

  2. The tiles are installed, but need grout.

    The tiles are installed, but need grout.

  3. The tiles are grouted.

    The tiles are grouted.

  4. The seams are taped.

    The seams are taped.

  5. Two female plugs are used to avoid splicing wiring.

    Two female plugs are used to avoid splicing wiring.

  6. The terminals are connected.

    The terminals are connected.

  7. The wheel studs are in place.

    The wheel studs are in place.

  8. The wheel studs are hammered out.

    The wheel studs are hammered out.

  9. The mounting bolts are tightened.

    The mounting bolts are tightened.

  10. The copper lines are inserted into the compressor.

    The copper lines are inserted into the compressor.

  11. The switch is good, but the battery contacts are not.

    The switch is good, but the battery contacts are not.

  12. The upper holes are drilled.

    The upper holes are drilled.

  13. The screws are getting mounted to the rim.

    The screws are getting mounted to the rim.

  14. The screws are all around the rim.

    The screws are all around the rim.

  15. The caliper pins are going back into place.

    The caliper pins are going back into place.

Back
Top