suddenstorm
Member
- Joined
- March 10, 2013
- Messages
- 23
- Reaction score
- 0
- City, State
- Islip Terrace, New York
I am very excited about this. I am 45 and this is the first vehicle I have ever factory ordered. They seem to all be coming fully loaded by me. All I wanted was a silver sport with the 400A tow hitch and power liftgate.
I ended up ordering on Friday the silver with the 402A package and no moon roof. I have a 2011 Edge and my wife and I never use the moon roof.
I opted for the 402a because there were 2 small features that were not available as a stand alone option that were pretty important to me as silly as it sounds. The Garage door opener and the Ambient lighting. With black interior I feared the cabin to be like a cave at night, and the garage door opener (home link as it used to be called) was something I missed having since my 2002 Windstar SEL.
I have a couple of questions.
(1) I have watched a number of videos about this car and a coulple of them say that the 402A comes with power rear folding seats.. but yet I cannot find that written anywhere.
(2)I signed the paper work and gave my deposit on Friday. They said that the order goes in on Monday. Is the 6 to 8 week period a normal time frame for the build of this vehicle?
Thanks in advance!
Tom
I ended up ordering on Friday the silver with the 402A package and no moon roof. I have a 2011 Edge and my wife and I never use the moon roof.
I opted for the 402a because there were 2 small features that were not available as a stand alone option that were pretty important to me as silly as it sounds. The Garage door opener and the Ambient lighting. With black interior I feared the cabin to be like a cave at night, and the garage door opener (home link as it used to be called) was something I missed having since my 2002 Windstar SEL.
I have a couple of questions.
(1) I have watched a number of videos about this car and a coulple of them say that the 402A comes with power rear folding seats.. but yet I cannot find that written anywhere.
(2)I signed the paper work and gave my deposit on Friday. They said that the order goes in on Monday. Is the 6 to 8 week period a normal time frame for the build of this vehicle?
Thanks in advance!
Tom