Swee294349
Well-Known Member
- Joined
- November 19, 1999
- Messages
- 687
- Reaction score
- 0
- City, State
- Fort Collins, Colorado
- Year, Model & Trim Level
- '91 XLT 4x4
Mission Complete
Well i got my superrunner kit installed tonite. still need to get it realigned and haven't tested it out on the road yet. it took about 4 hrs to get it all done. ran into a few problems on tryin to get the crown nuts to be able to thread far enough so we could get the kotter Key in. but we got it all done and looks pretty good.
Well i got my superrunner kit installed tonite. still need to get it realigned and haven't tested it out on the road yet. it took about 4 hrs to get it all done. ran into a few problems on tryin to get the crown nuts to be able to thread far enough so we could get the kotter Key in. but we got it all done and looks pretty good.