Rick,
Alec is OK, he is still in casts. He was supposed to get them removed 2 weeks ago, but the doc decided to recast with a shorter cast since he still had some tenderness. He still cant go to the pool, but he is at a day camp this week. so getting some fun in, and he went on the cleanup run last weekend and had a great time(he won a few things in a raffle we had which helped- getting stuff is fun)
Yea my kitchen remodel is an addition/remodel of the kitchen. I have the shell built and finished to the exterior/ rough ins are almost done. Still placing electric- lights and such. Its on a concrete slab and Ive been cutting for ducts and water lines- takes me a while. I was hoping to pour the new floor area, and patch the cut outs before we leave for OBX on sat.- doesnt look good if my plumber doesnt get here tomorrow. Nov 1 is my new completion date, thats 6 weeks late. I was to be done before I bought a new rental property which is supposed to close end of september- waiting for a engineers report - may not happen at all, or I may postpone it (if I can). So Ive over extended myself. I had Alec placed in all kinds of camps this summer so I could get stuff done and that plan was OBE first week of summer- Oh well
I should make up time here in Sept when the kids get back to school, so should know better by Oct what my free time should look like for a trip to NC. I think its 6 hours for me Ill have to take a look again.