Almost there...
Well, sorry for the long delay. Been busy working on other items (mainly outside house work I've been putting off) to post an update.
The apron from the donor vehicle want on with out a hitch.
Hugh thanks to MONMIX & vroomzoomboom for the tips, invaluable!
I took the time to prime and finish paint the apron, which I'll need to re- paint where I tack and spot welded it back in since that essentially burnt it off. I know silly move on my part, I should have been thinking ahead, but at least the areas to hard to paint won't be a problem. As well the support arm that's welded to the apron I took the time to derust and prime. Since all of it was primed with weld thu primer I don't think rust will be a problem, but all the same I recoated the hidden areas with undercoating.
The welding took several hours, mostly because I was checking and double checking the measurements as I went along. I've found unless metal is about 1/4" or more the larger areas tend to shift/shrink/warp so, slow and steady.
*side note - Taking pix of welding can be fatal to the camera! I killed my digital camera taking pix of the welding. It wiped out the ccd (photo cell) and left it unable to take any photo's, now toast.
Ok so some pix with the new camera.
I still have to take some more pix to upload.
So a break down of the costs so far:
New Core support: 200.00
New Radiator: 85.00
Drill bits for cutting spot welds: 3 x 4.00: 12.00
All new lighting: 32.00
AntiFreeze: 24.00
Belt Tensioner: 55.00
Paint: 20.00
Primer: 48.00
Shocks: 96.00
================
So Far: 572.00
Cost of the vehile: 300.00
So about 872, so far, not to mention the countless hours of work.
Cheers!
-Joe