And here they are all welded up. I plan to do more bracing on the upper side of these mounts which is where you will see in them in the engine bay but ran out of time for now.
100_3278.JPG

100_3279.JPG

100_3280.JPG

100_3281.JPG
 



Join the Elite Explorers for $20 each year or try it out for $5 a month.

Elite Explorer members see no advertisements, no banner ads, no double underlined links,.
Add an avatar, upload photo attachments, and more!
.





The shock hoops where then tacked in place double checked then I did 2 1" sections on each frame mount with the TIG welder fully maxed out at 175 amps. That let me know there is a 2" worth of hot TIG weld on each of the 4 frame mounts. I then cranked up the MIG and fully burned them to the frame plates. Again the frame plates are there because its the only flat spots on the frame and I had to move the hoops a little bit forward on the plates because I wouldn't be able to get to the blower motor ever if I didn't

This is 4 pictures of all 4 different mounts for the hoops.
100_3289.JPG

100_3290.JPG

100_3292.JPG

100_3293.JPG
 






Then made a temporary shock hoop brace so that the hoops would have some support on the drive home This is not metal fit yet and will have some tube clamps that will allow it to be removable as well.
100_3346.JPG

100_3349.JPG

100_3351.JPG
 


















Here is the rest of the trans crossmember. Bent a piece of 1/4" plate for where it holds the transmission and then made a 1/4" support in the center. Its all fully welded of course but in these pictures its not.

100_3276.JPG

100_3282.JPG

100_3284.JPG

100_3287.JPG
 






Here are some of the other projects that where done in class. Several engine stands several tubing benders and tubing notchers. But these are the bigger projects.

These 2 guys had pictures of the ariel atom and with instructor help scaled it all and these are the starts to the frames they built after the ariel.
100_3378.JPG

100_3381.JPG

100_3382.JPG

100_3383.JPG
 












Here is a mustang that is owned by one of the instructors. He did the rectangle mandrel bent frame but some of the better students in the class did all the tube work. It really turned out great!!!

100_3392.JPG

100_3394.JPG

100_3397.JPG

100_3398.JPG
 






Here is a bit more on the steering box. I made some sleeves out of some 1" solid bar stock drilled out to 7/16" for the box bolts. The bolt spread is barely big enough to allow the top and bottom bolts to go above and below the frame rail. I still need to drill the hole and sleeve the 3rd bolt but that can be done later.

100_3273.JPG

100_3298.JPG

100_3299.JPG

100_3312.JPG
 






Of course I still need to fully weld on the steering box plate and do that 3rd bolt. But it got the box in place and allowed me to build everything else and see clearance things. The sleeves and plate will all be fully welded to the frame.

100_3300.JPG

100_3305.JPG

100_3313.JPG
 






This is the picture that describes what I was talking about earlier. How when it goes to full compression the tie rod will hit the joint on the pitman arm. So I need to get another pitman arm and ream it from the top so that I can move the drag link to the top of the pitman arm. This will solve my issue. This picture is deceiving there is 2 1/2" of clearance there but that's not enough and there is plenty of room above the pitman arm.

100_3310.JPG
 






This is the drag link and when the ends are threaded in I believe it ended up at about 32" long. The trac bar was designed and built to match the drag link to eliminate bump steer. Also the trac bar was matched with the angle that the drag link will be at when it sits on top of the pitman arm.

Also on the table you can see the axle side bracket for the trac bar.
100_3308.JPG


First pass welding the bungs to the drag link.
100_3326.JPG

100_3325.JPG
 






I put the steering box dead centered and then set toe on the tires then put the joints on the pitman arm and in the tie rod and threaded on the bungs and measured. That gave me the tube length for the drag link.

100_3309.JPG

100_3311.JPG
 












Welding up the upper link mounts to the truss. again pictures look funny for the mounts since the mounts are set back from one another to accommodate the upper links that are at an angle.

100_3321.JPG

100_3322.JPG

100_3327.JPG

100_3328.JPG
 






Here is the trac bar. It is 1 1/2"X.375 wall tubing.
100_3306.JPG


Had to put it in the lathe and drill out the center so that it could be tapped for the 1" shank on the narrow JJ for the axle end of the trac bar.
100_3307.JPG


Notching the trac bar for the urethane frame side mount for the trac bar.
100_3323.JPG


The ring for the urethane mount. Both the urethane mount end and the narrow JJ side have 5/8" grade 8 bolts. Everything is nice and big. The urethane has 2 halves that you can hand press in and then has a steel sleeve that goes through the center.
100_3320.JPG
 






Here is the narrow JJ that threads straight into the tubing.
100_3324.JPG


Here is the frame side mount for the trac bar. (Still needs to be fully welded)
100_3339.JPG


Axle side mount for the trac bar. I have another plate to weld onto it. I will lay a plate at a 45* angle from the front edge of the mount to the axle so that it will help support the mount from the stress it will see from the trac bar.
100_3340.JPG


There is a nut welded to the back side of the mount so that the bolt can just go in and hold the trac bar. Small thing but no worries is that you have to tack off the tie rod in order to get the trac bar bolt in and out.
100_3341.JPG
 






I bent the trac bar a little in order to help clear the pitman arm when the passenger side will be in compression. It gives me 7" of compression on that side before it will hit the pitman which is more than the shock is set up for so it will be perfect. Bending this thing was almost a joke. It took 3 people on the bender and it bend the pins in the bender just to get it to do this little bit. If you don't want to break your bender then this tube isn't the one you want to use. But hey since they have access to lathes they will just machine new pins for about $2. But it sure did turn out great though.WAY overkill but this I do not want to bend under any circumstances. Brings safety on the freeway to mind. Here are the pictures I know a few guys really wanted to see how this one turned out. These pics are of it at full droop so its hard to see how the bend helps it clear the pitman arm. Also I should take a few pictures of the weld I did with that ring to the trac bar. The huge TIG machine was at 220 amps to weld it on and get penetration and was also probably the best weld that I have done on the truck. The very last structural TIG weld on the truck was my best, that was awesome and I am so happy with it.

You can see the urethane bushing all installed in the end. It took over 4 hrs for the trac bar to cool enough to allow me to put it in the urethane and me not worry about it melting it. 3/8" wall tubing takes forever to cool.
100_3342.JPG

100_3361.JPG

100_3362.JPG

100_3363.JPG
 



Join the Elite Explorers for $20 each year or try it out for $5 a month.

Elite Explorer members see no advertisements, no banner ads, no double underlined links,.
Add an avatar, upload photo attachments, and more!
.





After reading you last few posts, I'm at a loss for words right now. A lot to take in all at once, but this is a great thread for those that will learn from your work here.

After it is finished, and taken to the trails, you will see what needs to be tweaked, and can make some final comments on what works, and why.

How many hours do you think you have in this build? :scratch:
 