I'm trying! LOL you funny guy
TGIF!!!
Okay lets get you guys caught up to speed....
Holley wiring is mostly installed!!
We have an active warranty claim with RCV I am to send in the defective half shaft for repair!!
Thanks to Eddie Money following up with RCV this time around, we finally have light at the end of the tunnel. We have been after a replacement CV axle since 10/2020
All engine parts are clean and being prepped for final install... we should be ready to program the Holley pcm!
I have lots of pictures to get through here so I figured I better get an update posted!!
First up the comp cams pushrods and factory rockers needed to be installed, so I could do the final install of the valve covers and fuel rail......then finally the Holley wiring could be fit to the truck, engine and transmission
What a view! Shop has been spring cleaned and organized, truck was cleaned by hand (again), ready for the next round of parts!!
comp cams 6.3 magnum pushrods
Each one dipped in oil and installed into the lifter valley
Factory rockers and pedestal mounts cleaned, dipped in oil and installed. Engine turned over by hand several times (15/16" socket on crank damper)
Each rocker I bring to zero lash by hand then torque down. With the pushrod on the base circle of the camshaft (valves closed) It should take less then a half rotation/turn to achieve torque value
Valvetrain torque checked several times....28 ft lbs and done
Valve covers final installed with Felpro cork gaskets/permatex
Don't worry that light surface rust / gasket surfaces will be cleaned up, of course
Mmmmmmm yummy Mobil one 0-40W European car formula!!
both banks done, surfaces cleaned and prepped, time for valve covers
New 19#/hr (remanufactured, flow tested and matched set) 98-01 style injectors and O rings
Next up camshaft and crank sensors, the last step before the Holley wiring can go in
