Thanks Chris,
I've been to the IMS in Irvine and its a nice place but they don't
carry DOM tubing or at least when I went there they didn't. RockRanger has a place near him that has DOM for resonable prices and I've had him pick up some tubing for me. Whenever I decide to do a cage i'll head down there myself and pick up what I need.
Updates...well scratch what i've posted about the track bar bracket because I've fabbed up a new one. On the original one I had made you'll notice I had a tube end on there. I was going to flip the track bar (from B.C. Broncos) around and use the end with the heim on it on the axle end. After playing around with it I decided I liked the way the track bar was originally intended to be used, with the urethane bushing at the axle end. So, i've got the new bracket all tacked up and ready for final welding.
Also I've got the gussets cut out for the axle bridge, I just need to get that tacked up and then I can cut some link brackets that will be welded to the axle bridge.
The upper links are cut, just got to tack in the tube ends and weld the upper link tabs to the lower links. Those links ended up being 18" eye to eye. No real rhyme or reason to that measurement other than I was going by the upward bend in the frame...I wanted the link as long as possible without it hitting the frame on uptravel. I don't remember if i mentioned it before but my lower links are 36" eye to eye and they land exactly where the original tranny X-member was.
So what's left? As mentioned above, upper link brackets for the axle bridge need to be cut and a new track bar bracket for the frame end also needs to be cut since the one I made won't work with the new track bar bracket I just made for the axle end. The holes don't line up and I need new holes that are further out from the frame.
I'll have Friday off so I'll have 3 solid days to get some more done on my junk and I should be real close to finishing or who knows, maybe i'll suprise myself and actually get it finished!
I'll get some pics up this week.